Clients Brief:
QUBE engaged DMD to assist their architects in the initial designing phase of their new warehouse facility in North Fremantle. The racking design was configured to QUBE’s specifications in regards to the storage volume required and DMD worked with their architects to ensure the designed layout of the warehouse was adequate and access doors and fire hydrants etc were located corectly to allow for racking installation and maximisation of space utilisation.
DMD’s Solution:
DMD designed and supplied a turnkey racking package for QUBE’s new warehouse facility.
